the time is running out . i have to get this thing done by april 15th, first meet in greenwood, ar.. chrome is going to the shop in the morning, and the paint job is almost done. forks and front end are ready for mounting. now it's all the little stuff that has to be done. built my fuel tank yesterday and tacked it together ready to be tig welded as soon as i make the filler neck and mounts. my last big project is mounting the 32 mm mikuni flatslide. very limited space for the carb and aircleaner so i'm still up in the air on my manifold design and how i'm going to design the shape. this may be my biggest problem so far. i may bring it to b2 dads meet & eat in july so folks can see it.