fixit3546 Posted September 24, 2007 #1 Posted September 24, 2007 Thought i'd post a few for the folks that ain't ever seen one torn down. These are the few i thought to take during my frame change. Can you find the Ninja Turtle on a Motorcycle??? Picts are as follows... Putting in the engine. we used a come-a-long suspended from a tree. Rope around the heads. Putting in the engine, a big helper there. jake efter getting out of the hospital, on the way to NAS P-Cola (not sure how i got it in here) Upper triple tree clamp and hardware (blury) Uppre clamp removed. Naked frame. Broken frame from the top (cant tell much) Naked frame. Two naked frames. Rear section. A mess. Right side swing arm pin. Swing arm pin goes here. Another one. Left side swing arm pin. Swing arm removed.(shock still in place) Swing arm inspection plug. Rear shock. Frame reinforced by Woodys Welding Service. (The left side (pict left) is almost two low to get to the exhaust clamp) The Tropical storm moves in. O-ring (red is original) Another shot. Oil line Someone asked about changing rod bearings with the engine in frame. This is a shot from the oil pan. another one another one More crap from the oil strainer(gasket, silacone, chewed up plastic and stuff) Another one (i found the chewed up o-ring and the steel ball in this mess) Red-neck engine lift. Trying to figure out what to do with a broken frame (blurry)
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now